Skip to content

Çan 2 Power Plant, 1 × 330 MW (Second-hand Plant)

REHABILITATION · POWER PLANTS / THERMAL

Çan 2 power plant

Scope of work · Rehabilitation and erection

  • 6 coal mills and pulverized coal dust collection systems
  • Coal and ash handling conveyor systems
  • ID, FD, booster and recirculation fans
  • Electrostatic precipitator (ESP) installation
  • Slag extraction, soot blowers and water jet blowers
  • Fuel oil system equipment
  • Luvo air preheaters and final combustion grates
  • Each component overhauled first, then erected

On site