Çan 2 Power Plant, 1 × 330 MW (Second-hand Plant)
REHABILITATION · POWER PLANTS / THERMAL
Scope of work · Rehabilitation and erection
- 6 coal mills and pulverized coal dust collection systems
- Coal and ash handling conveyor systems
- ID, FD, booster and recirculation fans
- Electrostatic precipitator (ESP) installation
- Slag extraction, soot blowers and water jet blowers
- Fuel oil system equipment
- Luvo air preheaters and final combustion grates
- Each component overhauled first, then erected