Skip to content

Rehabilitation works

The foundation of our track record: revisions, retubing and upgrades inside operating plants, engineered around short shutdowns.

  • AKSA Göynük 2 × 135 MW · retubing and limestone upgrade
  • Çan 2 1 × 330 MW · second-hand plant rehabilitation
  • 13.6 MW biomass plants · economizer and boiler works
  • Enerjisa Tufanbeyli 3 × 150 MW · coal chute revision
  • Çumra Şeker · boiler superheater replacement
  • Oyka paper mill · ESP rehabilitation

Rehabilitation works