Rehabilitation works
The foundation of our track record: revisions, retubing and upgrades inside operating plants, engineered around short shutdowns.
- AKSA Göynük 2 × 135 MW · retubing and limestone upgrade
- Çan 2 1 × 330 MW · second-hand plant rehabilitation
- 13.6 MW biomass plants · economizer and boiler works
- Enerjisa Tufanbeyli 3 × 150 MW · coal chute revision
- Çumra Şeker · boiler superheater replacement
- Oyka paper mill · ESP rehabilitation
Rehabilitation works
-
-
-
-
-
-
Enerjisa Tufanbeyli
Coal Chute Revision · 3 × 150 MW fluidized bed
View project: Enerjisa Tufanbeyli -
-