AKSA Göynük: Limestone Feeding Upgrade
REHABILITATION · POWER PLANTS / THERMAL
75 → 110 t/h limestone feeding capacity, 2 × 135 MW plant
Scope of work
- Revision of the 800 mm limestone feed belt discharge chute
- 2 rotary feeders to feed both mills separately
- Raising the cones of 2 × 500 m³ silos by approx. 3.5 m, incl. seismic design
- Steel structure fabrication, erection, dismantling and testing