13.6 MW Biomass Plant: ECO 4–5 Replacement
REHABILITATION · POWER PLANTS / BIOMASS
Turnkey replacement of ECO 4–5 packages fabricated from seamless 16Mo3 tubes (Ø42.4 × 4.0 mm, European origin), including pipe-bend manufacturing, assembly and testing, plus replacement and welding of boiler wall pipes.
Scope of work
Economizer
- Pipe supply
- Pipe bending and welding
- Scaffolding installation
- Removal of economizer module pipes
- Installation and welding of new pipes
- Hydrostatic test
- Insulation
Boiler
- Scaffolding installation
- Dismantling of damaged pipes
- Installation and welding of new pipes
- Hydrostatic test