Skip to content

Çankırı Saltı Salt Factory Thermal Power Plant

GREENFIELD · POWER PLANTS / THERMAL

Electrostatic precipitator and ducts at the Çankırı Saltı plant

Scope of work

  • 44 t/h, 61.8 bar(g), 465 ± 5 °C atmospheric fluidized bed boiler
  • 4.4 MWe counter-pressure steam turbine
  • Fuel delivery and ash transport systems
  • ESP (electrostatic precipitator) filtration systems
  • Refractory and insulation works
  • Electrical and automation works
  • Commissioning

Technical data

Boiler, fuel and ash handling systems

21,848 kg/h total coal feeding capacity (8 × 2,731 kg/h)

Boiler44 TPH, 63 kg/cm²(g), 465 ± 5 °C AFBC single drum
Coal transferBelt conveyor (50 m, 650 mm band) + 2 elevators
Transfer rate30 t/h coal + 5 t/h
Coal bunker235 m³ hard coal + 20 m³ lime
Coal feeding8 feeders × 2,731 kg/h
Ash system1,200 kg/h; 3 screw conveyors + 1 bucket elevator

Electrostatic precipitator

99.58% collection efficiency

Gas flow96,269 m³/h
Temperature160 °C
Ash typeFly ash
Collection area1,574.4 m²
Output voltage95 kV DC peak

Steam turbine

4.4 MW back-pressure turbine & generator set

Turbine speed4,400 / 1,500 rpm
Gearbox speed4,400 / 1,500 rpm
Generator1,500 rpm

Designed and manufactured by Kessels Engineering Works Pvt. Ltd.; electro-mechanical erection, testing and turnkey commissioning by Hecon A.Ş. with Kessels.