13.6 MWe Biomass Power Plant (Forest Waste Fired)
GREENFIELD · POWER PLANTS / BIOMASS
Scope of work · Erection
- Biomass boiler (55 t)
- Filtration system: cyclones, bag filter, ID fan, stack
- Primary and secondary air fans
- Cooling tower, pump station and cooling water piping
- Fuel handling and transfer system
- Ash handling system
- Raw and demineralized water system
- Fire-fighting system