13.6 MWe Biomass Power Plant (Forest Waste Fired)

GREENFIELD · POWER PLANTS / BIOMASS

Heavy lifts and boiler erection, Aydın Çine

Scope of work · Erection

  • Biomass boiler (55 t)
  • Filtration system: cyclones, bag filter, ID fan, stack
  • Primary and secondary air fans
  • Cooling tower, pump station and cooling water piping
  • Fuel handling and transfer system
  • Ash handling system
  • Raw and demineralized water system
  • Fire-fighting system

On site