Çan 2 × 160 MW Fluidized Bed Power Plant

MANAGED PROJECT · POWER PLANTS / THERMAL

Flagship power plants managed by our leadership team in previous roles (personal experience).

Çan 2 × 160 MW fluidized bed power plant

53,000 t erected for both units; Türkiye's first CFB plant

Scope of work

All electro-mechanical erection: boiler steel structures, pressure and non-pressure parts, piping, ducts, ESP, FGD, turbine-generator and turbine hall, condenser, BOP, coal and ash handling, water and fuel systems, insulation, refractory, HVAC, fire fighting and all electrical works.